Casino Alliance Batumi 2018
DESIGN
Full MEP Works:
- Firefighting
- Heating,Ventilation and air Conditioning
- Water Supply, Sewage, Drainage
- Extra low voltage
- Electrical Power Supply
- Plumbing
2 000 m²
Biltmore Hotel Meeting Room 2018
DESIGN and BUILT
Full MEP Works:
- Firefighting
- Heating,Ventilation and air Conditioning
- Water Supply, Sewage, Drainage
- Extra low voltage
- Electrical Power Supply
- Plumbing
500 m²
DESIGN and BUILT
- Heating
- Ventilation
- Air Conditioning
5 000 m²
DESIGN and BUILT
- Water Supply
- Sewage
- Drainage
110 000 m²
DESIGN and BUILT
- Water Supply
- Sewage
- Drainage
120 000 m²
Luxury Apartment Opera 2013
DESIGN and BUILT
- Water Supply
- Sewage
- Drainage
- Heating
- Ventilation
- Air Conditioning
6 000 m²
DESIGN and BUILT
- Heating
- Ventilation
- Air Conditioning
- Plumbing
5 000 m²
DESIGN and BUILT
- Water Supply
- Sewage
- Drainage
- Heating
- Ventilation
- Air Conditioning
200 000 m²
DESIGN and BUILT
- Water Supply
- Sewage
- Drainage
- Heating
- Ventilation
- Air Conditioning
200 000 m²
Central Public Health Reference Laboratory 2010
DESIGN and BUILT
- Water Supply
- Sewage
- Drainage
Darialy Hydro Power Plant
DESIGN and BUILT
- Firefighting
- Heating
- Ventilation
- Air Conditioning
120 MW