Loading...

Archi Wood 2020

REVISION and INSTALLATION
    Full MEP Works:
  • Firefighting
  • Ventilation
  • Water Supply, Sewage, Drainage
  • Extra low voltage
  • Electrical Power Supply

17 floors, 250 apartments

Republic 24 Restaurant 2019

DESIGN and BUILT
    Full MEP Works:
  • Firefighting
  • Heating,Ventilation and air Conditioning
  • Water Supply, Sewage, Drainage
  • Extra low voltage
  • Electrical Power Supply

500 m²

Tskneti Residence 2018

DESIGN and BUILT
    Full MEP Works:
  • Firefighting
  • Heating,Ventilation and air Conditioning
  • Water Supply, Sewage, Drainage
  • Extra low voltage
  • Electrical Power Supply

120 000 m²

Georgian National Shootung Federation 2019

DESIGN and BUILT
  • Water Supply
  • Sewage
  • Drainage
  • Electrical Power Supply

Kutaisi Airport Terminal 2

DESIGN and BUILT
  • Water Supply
  • Sewage
  • Drainage
  • Electrical Power Supply

Tunnel Mestia 2019

DESIGN
    Full MEP Works:
  • Firefighting
  • Heating,Ventilation and air Conditioning
  • Water Supply, Sewage, Drainage
  • Plumbing
  • Extra low voltage
  • Electrical Power Supply

1 335 m

Tunnel Abastumani 2019

DESIGN
    Full MEP Works:
  • Firefighting
  • Heating,Ventilation and air Conditioning
  • Water Supply, Sewage, Drainage
  • Plumbing
  • Extra low voltage
  • Electrical Power Supply

370 m

Medical Center Reproart 2019

INSTALLATION
  • Heating
  • Ventilation
  • Air Conditioning

Sun Petroleum 2019

INSTALLATION
  • Heating
  • Ventilation
  • Air Conditioning